§ 82-19. Sewer permit fees.  


Latest version.
  • Sewer permit fees shall be as follows:
    A. 
    Residential: $0.75 per square foot with a minimum fee of $1,000 per dwelling unit, except for owners/occupants who are exempt senior citizens.
    (1) 
    For residential projects containing low- and moderate-income dwelling units, the sewer hookup fee for the low- and moderate-income dwelling units shall be reduced to $600 per dwelling unit. The fee for market-rate units will be as noted above.
    B. 
    Nonresidential: $0.75 per square foot with a minimum fee of $2,500.
    C. 
    Exempt senior citizen: $15.
    Editor's Note: A resident qualified for tax purposes for the senior citizen exemption.
    D. 
    Assunpink Basin sewer reimbursement.
    (1) 
    The owners of properties within the developments listed below, all of which will be benefited by the sewer improvement within the Assunpink Basin, shall pay the sum set forth in Subsection A(4)(b) to Polekoff Farm, Inc., and Windsor Development Corporation, d/b/a/ Winbrook, Inc., who paid for the construction of said sewer in lieu of the fees set forth, as applicable, above. The developments are as follows:
    (a) 
    Millbrook Farms (formerly Lanwin Lower Tract): 130 units.
    (b) 
    Windsor Hunt (formerly Dutch Neck Estates II): 149 units.
    (c) 
    Windsor-Princeton (formerly Wang Tract): 38 units.
    (d) 
    Windsor Park Estates (formerly Sharbell Tract): 132 units.
    (e) 
    Golden Estates (formerly Karis Tract): 46 units.
    (f) 
    Lower Portion of Le Parc II (formerly Bradgate and also formerly Squire's Gate): 30 units.
    (g) 
    Portion of Hunter's Run (formerly Mesa): 27 units.
    (2) 
    The sum referred to in Subsection D(1) shall be $8,500 per lot for Windsor Park Estates (formerly Sharbell Tract); the sum for all others set forth in Subsection D(1) shall be $9,300 per lot. No interest shall accrue on sold sums.
    (3) 
    The Construction Official shall maintain a list of the individual lots contained in the above developments, and no certificate of occupancy shall be issued unless a written receipt evidencing payment of the aforesaid sums to Polekoff Farm, Inc., and Windsor Development Corporation, d/b/a Winbrook, Inc., shall be filed with the Construction Official.
    E. 
    Clarksville Road-Everett Drive extension sewer reimbursement.
    [Added 3-25-2002 by Ord. No. 2002-04]
    (1) 
    The owners of all properties abutting the Clarksville Road-Everett Drive sewer extension who will be connected to the sewer extension shall pay the pro rata share of the cost of the construction of the aforesaid extension based upon their proportionate flow as a percentage of the total estimated flow, as calculated by the Township Engineer.
    (2) 
    The above sewer reimbursement shall be in addition to the sewer permit fees imposed by Subsections A and B of § 82-19, as well as any sewer user charges that may be imposed pursuant to § 82-20 of the Code of West Windsor.
    Editor's Note: See Ch. 133, Sewers.
Amended 5-6-2002 by Ord. No. 2002-10